Labor Cost Calculator
How to Use This Calculator
- 1
Enter Hours per Worker (hrs)
Enter the hours each worker spends on the job or project.
- 2
Enter Hourly Rate ($) and Workers
Use the labor rate per hour and the number of workers. The calculator assumes every worker has the same hours and rate.
- 3
Review total cost and total man-hours
Total labor cost is the combined hours multiplied by the hourly rate; total man-hours is hours per worker multiplied by the worker count.
Example Calculation
A project needs two workers for 40 hours each at an hourly rate of $35.
Hours per Worker (hrs)
40
Hourly Rate ($)
35
Workers
2
Results
Total Labor Cost
$2,800.00
Total Man-Hours
80 hrs
Hours per Worker
40 hrs
Rate
$35.00/hr
Workers
2
Insights card shows the total hours and labor cost for the entered crew.
Tips
A third worker raises the estimate to $4,200
Change Workers from 2 to 3 while keeping 40 hours per worker and a $35 hourly rate. Total labor becomes 120 hours and $4,200.
A $45 rate makes the two-worker estimate $3,600
Change Hourly Rate ($) from $35 to $45. For two workers working 40 hours each, cost rises by $800 while total man-hours stays at 80.
Halving the schedule cuts the estimate to $1,400
Change Hours per Worker (hrs) from 40 to 20. At two workers and $35 per hour, the estimate becomes 40 total man-hours and $1,400.
What this calculator estimates
Labor cost is the hourly rate multiplied by the total hours worked by all workers. This calculator assumes each worker has the same schedule and rate, and it does not add overtime premiums, payroll taxes, benefits, materials, or other project costs.
How the labor-cost formula works
Total man-hours = Hours per worker × Number of workers
Total labor cost = Total man-hours × Hourly rate
For the example, 40 hours per worker × 2 workers = 80 man-hours. Then 80 man-hours × $35 per hour = $2,800 in labor cost.
Man-hours measure the total work supplied, not the time the job takes from start to finish. The estimate also assumes the $35 rate applies to all 80 hours.
How crew size and rate affect the estimate
Changing crew size increases total hours and cost if each worker keeps the same schedule. Changing the hourly rate affects cost but not total man-hours.
| Hours per worker | Workers | Hourly rate | Total man-hours | Total labor cost |
|---|---|---|---|---|
| 40 | 1 | $35 | 40 | $1,400 |
| 40 | 3 | $35 | 120 | $4,200 |
| 40 | 2 | $45 | 80 | $3,600 |
A larger crew does not always shorten a project in direct proportion to crew size: task sequencing, workspace, and supervision can limit how much work people complete at the same time. Use the project time estimator to estimate duration, or the moving labor cost calculator for hourly moving labor.
Costs to add before setting a project budget
The result is direct wage cost only. Add employer taxes, benefits, overtime premiums, travel time, or contractor charges if they apply to your project. The U.S. Department of Labor summarizes federal overtime pay requirements; actual obligations can depend on worker classification and state law.
For a broader view of labor spending against sales, compare your estimate with the labor cost as a percentage of revenue calculator. To estimate material and operating expenses as well, use an operating cost calculator.
When to use a different calculator
- Compare labor spending with business revenue → Labor Cost as % of Revenue Calculator
- Estimate the time needed for a project → Project Time Estimator Calculator
- Calculate labor costs for a product batch → Candle & Soap Labor Cost per Batch Calculator
- Estimate hourly moving labor charges → Moving Labor Cost Calculator (Hourly)
Frequently Asked Questions
How do I calculate total labor cost?
Multiply hours per worker by the number of workers, then multiply the total hours by the hourly rate. 1. Calculate total man-hours: hours per worker × workers. 2. Multiply total man-hours by the hourly rate.
Does this estimate include payroll taxes and benefits?
No, it multiplies the entered hourly rate by labor hours and does not add employer payroll taxes, benefits, insurance, or other overhead. For a broader labor budget, include those costs separately or use the [labor cost as a percentage of revenue calculator](/calculators/labor-cost-as-of-revenue-calculator/).
What if workers have different hourly rates or schedules?
Calculate each group separately and add the subtotals. This calculator assumes every worker has the same hours and rate, so one blended rate can hide differences in pay or shift length.
Does the calculator add overtime pay?
No, it applies the same entered rate to every hour. Federal overtime rules generally require covered, nonexempt employees to receive at least one and a half times their regular rate for hours over 40 in a workweek; check the U.S. Department of Labor's overtime guidance and applicable state rules.
Is total man-hours the same as project duration?
No, man-hours measure combined worker time, while project duration is elapsed time on the calendar. Two people working 40 hours each contribute 80 man-hours but may complete the work over one 40-hour week.